By via of the base point of filling up water in reservoir at the end of flood season, a pre-schedule line to typical hydro-graph and original water level target can be obtained. 该调度图方法以汛末蓄满水库为基本出发点,确定典型来水过程的预调度线和初始目标(控制)水位线;
The authors think the key for completing water and soil loss control in slope arable land is dependent on innovation and organizational leadership under guidance of science and technology as pioneer, structural regulation as emphasis, stereo development as main line and ecological-economic-social development as target. 作者认为以科技为先导,结构调整为重点,立体开发为主线,生态经济社会发展为目标,坚持改革,加强组织领导是完成坡耕地水土流失治理的关键。